Location | 1-6-15 Nishi Shimbashi, Minato-ku, Tokyo |
---|---|
Structural Details | Steel construction (CFT pillars) 11 aboveground floors, 1 penthouse floor |
Site Area | 1,122.53m2 |
Floor Area | 9,210.56m2 |
Leasable Floor Area | 7,164.86m2 |
Design and Construction | Taisei Corporation |
Completion | April 2016 |
Features
- Convenient access from four stations, meeting demand for various business environments
- Sophisticated glass exterior that won the 2018 Minato-ku Scenery Town Development Prize
- Organized spaces allow for easy layouts
Building Overview
Overview of Standard Floors
Floor Load | 500kg/m2 (Heavy duty zones: 800kg/m2) |
---|---|
Interior Finishings | Ceiling: Grid ceiling system Flooring: Carpet tiles Walls: Emulsion paint |
Ceiling Height | 2,800mm |
Raised Floor | 100mm(Free access) |
Floor Height | 4,100mm |
Overview of Facilities
Illumination at Desk Level | 700Lx |
---|---|
Air Conditioning | Air-cooled heat pump multipackage with heating and cooling (individual air conditioning) |
Elevators | 4 total (1 emergency) |
Security | Contactless IC cards, security cameras, passive sensors |
Parking Spaces | 29-car tower parking lot |
Floor Plan

Public Transport
- 3-minute walk to Toranomon Station on the Tokyo Metro Ginza Line
- 4-minute walk to Kasumigaseki Station on the Tokyo Metro Chiyoda Line, Marunouchi Line, and Hibiya Line
- 3-minute walk to Uchisaiwaicho Station on the Toei Mita Line
- 8-minute walk to Shimbashi Station on the JR Line